NATURAL CAPITAL: ENVIRONMENTAL IMPACT

After identifying the most relevant environmental impacts of our

operations – specifically water, energy and waste – the group

introduced an environmental strategy in 2014 (see below). This

strategy explains how our approach is informed by best practice,

proven methods, ease of implementation, and the benefit and cost

of retrofitting green design principles to existing buildings. Identified

opportunities include lower operating costs, reduced liability and risk

of higher utility costs.

Our environmental strategy illustrates how Hyprop mitigates related

impacts where possible and proactively manages natural resources.

Highlights

•

•

78% of waste recycled

•

•

Cost savings of R24 million

•

•

Third submission to CDP on carbon emissions

•

•

Third participation in GRESB

As a landlord, our business has a low environmental impact, but

we aim to further reduce this in daily operations. The execution,

reporting and review of our environmental policy are monitored

regularly by management and annually by the social and ethics

committee.

PRIMARY TARGETS (BASELINE JUNE 2013)

TARGET

ACHIEVED

•

•

Energy (electrical) consumption:

average 1% reduction per annum

across portfolio

•

•

Water consumption: 4,5%

reduction by 2016

•

•

Recycling: 5,9% improvement

across the portfolio (2013

baseline, 60%)

•

•

Carbon emissions: in line with

electricity consumption

reductions

(July 2015 to June 2016)

•

•

Electricity: 1,5% estimated

reduction in 2016

•

•

Water: 5% estimated reduction

in 2016

•

•

Recycling: 78% estimated in 2016

(up from 75% in 2015)

•

•

Carbon emissions: 0,5% estimated

reduction in 2016

LOOKING FORWARD

Electrical

•

•

Eight energy-efficient LED projects planned,

subject to budget approval

•

•

Three photovoltaic projects identified for

implementation in 2016 and 2017

Water

•

•

Two sites will not get smart meters due to proposed

sales, another four deferred as not critical

•

•

Five sites already have bulk smart meters

Recycling

•

•

Approaching optimal economic viability.

Going beyond this will increase percentage of

recycling but will be costly

•

•

Carbon: scope 2 (landlord emissions) will decrease

as energy-efficient projects are implemented

SECONDARY TARGETS

•

•

Consider best practice in energy,

water reduction, waste

management and carbon

emissions

•

•

Consider green building principles

•

•

Manage biodiversity impacts

through responsible management

and considering best practice

•

•

Enhance stakeholder engagement

by exploring collaborative

opportunities with large users

•

•

Ensure compliance with

environmental legislation

•

•

Embed culture of environmental

responsibility across the group

•

•

Undertake annual environment-

specific risk assessments

•

•

Explore how innovation and

technology can support

competitiveness

•

•

At Rosebank Mall and Hyde Park, air-conditioning (AC)

systems replaced with air-cooled condensers instead

of water-cooled units

•

•

LED lighting installed in common areas across the

portfolio

•

•

Only energy-efficient AC systems considered on

replacement

•

•

High-reflective roof paint used at Woodlands and to be

used for repainting Atterbury Value Mart and Somerset

Mall roofs

•

•

Ecological stormwater attenuation dam system repaired

at Willowbridge

•

•

All tenant installations must comply with new SANS

energy-efficiency regulations

•

•

Human resources department rolling out Green Building

Council training for centre and operations managers

•

•

Ongoing monitoring and

training at property

operational level on

applying best practice

principles in managing

energy, water, waste

•

•

Ongoing engagement with

large national users of

energy and water, and

generators of waste

material

•

•

Consider green building

principles where possible

•

•

Develop a five-year plan

for optimising our water

resource (cost savings,

reduce waste, water

harvesting)

TARGET

ACHIEVED

FUTURE PROJECTS PLANNED